January 2023

MSD Technologies

We are thrilled to announce that MSD has recently acquired B&G Technologies, expanding our service offerings to include the Dayton, Cincinnati, and Columbus Ohio areas. B&G Technologies brings 20 years of expertise to our organization, and we are excited to have them on board. As a company specializing in commercial and residential security and fire

MSD Technologies Read More »

MSD’s Client Centric Mentality

At MSD, Inc., we are committed to delivering a client-centric mentality that prioritizes the health and success of our client relationships. We understand that these relationships are crucial to our company’s continued growth and success. The MSD Client Centric mentality consists of our team members committed to Securing, Maintaining, Supporting and Retaining our Client Relationships.

MSD’s Client Centric Mentality Read More »

Riverscape Ice Rink

At TEAM MSD, Inc we believe in our People, Clients and impacting our communities in a positive manner! Our team MSD, Inc. is honored to be a supporter and service provider of the Five Rivers Metro Parks – Riverscape Ice Rink, located in downtown Dayton on 237 E. Monument Ave. Dayton, OH 45402. This venue

Riverscape Ice Rink Read More »

WPAFB Sensors Lab

Wright-Patt Air Force Base sought contractors to renovate and add onto the Sensors Lab. The HVAC portion of the project was over $13 million.

  • MSD served as the Design Assist Contractor in conjunction with Heapy Engineering for this project. In collaborating with General Contractor, Butt Construction, MSD provided Design Assist solutions for the following:
    • A large, anechoic chamber
    • An outdoor range
    • Multiple, Class-100 clean rooms
    • A three-story office building addition with DCID 6-9 requirements on many of the rooms

WPAFB Chilled Water System

The chilled water system at a high-security building on the Air Force Base was undersized and unable to keep up with demand. The facility could not operate without chilled water due to the amount of information servers in the building, and the general nature of the building itself. The entire upgrade project would need to be completed with minimal shut down time at the building. HVAC portion of this project was over $3 million.

  • MSD worked in collaboration with Diaz Construction to complete the system upgrades on time and on budget with minimal shutdowns or disruption to the facility operations.

LJB, Inc.

LJB, Inc. was renovating their Miamisburg, OH office and wanted to incorporate energy-saving upgrades.

  • MSD provided Design Build services in tandem with Greensleeves Energy Solutions, a specialist in geothermal systems.
  • MSD and Greensleeves installed a new geothermal HVAC system with open and closed loops. In addition, MSD design and installed the plumbing portion of the renovation.