blog

“Wreck-less” Driving Tips

The National Highway Traffic Safety Administration (NHTSA) recently released estimates indicating that 31,785 people died in traffic crashes between January and September 2022. In 2020, four leading behavioral causes of collisions resulting in fatalities were driving under the influence (11,654), speeding (11,258), not using a seatbelt (10,893), and distracted driving (3,142). While MSD has workplace

“Wreck-less” Driving Tips Read More »

2023 Polar Plunge

Have you heard of the Special Olympics’ Polar Plunge? It’s a totally cool and fun way to make a difference in the lives of people with intellectual disabilities. And trust me, it’s an experience you won’t soon forget. The Polar Plunge is the organization’s signature fundraiser, and it challenges individuals and groups to step out

2023 Polar Plunge Read More »

MSD Technologies

We are thrilled to announce that MSD has recently acquired B&G Technologies, expanding our service offerings to include the Dayton, Cincinnati, and Columbus Ohio areas. B&G Technologies brings 20 years of expertise to our organization, and we are excited to have them on board. As a company specializing in commercial and residential security and fire

MSD Technologies Read More »

WPAFB Sensors Lab

Wright-Patt Air Force Base sought contractors to renovate and add onto the Sensors Lab. The HVAC portion of the project was over $13 million.

  • MSD served as the Design Assist Contractor in conjunction with Heapy Engineering for this project. In collaborating with General Contractor, Butt Construction, MSD provided Design Assist solutions for the following:
    • A large, anechoic chamber
    • An outdoor range
    • Multiple, Class-100 clean rooms
    • A three-story office building addition with DCID 6-9 requirements on many of the rooms

WPAFB Chilled Water System

The chilled water system at a high-security building on the Air Force Base was undersized and unable to keep up with demand. The facility could not operate without chilled water due to the amount of information servers in the building, and the general nature of the building itself. The entire upgrade project would need to be completed with minimal shut down time at the building. HVAC portion of this project was over $3 million.

  • MSD worked in collaboration with Diaz Construction to complete the system upgrades on time and on budget with minimal shutdowns or disruption to the facility operations.

LJB, Inc.

LJB, Inc. was renovating their Miamisburg, OH office and wanted to incorporate energy-saving upgrades.

  • MSD provided Design Build services in tandem with Greensleeves Energy Solutions, a specialist in geothermal systems.
  • MSD and Greensleeves installed a new geothermal HVAC system with open and closed loops. In addition, MSD design and installed the plumbing portion of the renovation.