Think Positive

I had a mentor in my life that always reminded me, “Your attitude determines your altitude”.

I don’t know anyone that has the greatest attitude or is always positive 24 hours a day 7 days a week, but what if we made a conscious effort to begin to look for the true value in the things and people around us?

Do I love getting up for work at 4:30 in the morning? Uh, No.  But I do love those mornings when the sun is just coming up and the birds are singing.

Do I love dealing with a difficult co-worker on a daily basis? Again, No. But I can handle each situation with that individual with a sort of grace and compassion.

Do I necessarily love all of the extra safety measures that have been put into place during these difficult times we are all going through. No, not especially. But my attitude can be one of, I get to go to work today!

Attitude: a settled way of thinking or feeling about someone or something

If an attitude is that thing which I can settle into, a choice to see the positive in the situations that may arise and the people I come in contact with everyday then there’s nowhere to go but up!

Stay positive!

 

-Lindsey Baker

WPAFB Sensors Lab

Wright-Patt Air Force Base sought contractors to renovate and add onto the Sensors Lab. The HVAC portion of the project was over $13 million.

  • MSD served as the Design Assist Contractor in conjunction with Heapy Engineering for this project. In collaborating with General Contractor, Butt Construction, MSD provided Design Assist solutions for the following:
    • A large, anechoic chamber
    • An outdoor range
    • Multiple, Class-100 clean rooms
    • A three-story office building addition with DCID 6-9 requirements on many of the rooms

WPAFB Chilled Water System

The chilled water system at a high-security building on the Air Force Base was undersized and unable to keep up with demand. The facility could not operate without chilled water due to the amount of information servers in the building, and the general nature of the building itself. The entire upgrade project would need to be completed with minimal shut down time at the building. HVAC portion of this project was over $3 million.

  • MSD worked in collaboration with Diaz Construction to complete the system upgrades on time and on budget with minimal shutdowns or disruption to the facility operations.

LJB, Inc.

LJB, Inc. was renovating their Miamisburg, OH office and wanted to incorporate energy-saving upgrades.

  • MSD provided Design Build services in tandem with Greensleeves Energy Solutions, a specialist in geothermal systems.
  • MSD and Greensleeves installed a new geothermal HVAC system with open and closed loops. In addition, MSD design and installed the plumbing portion of the renovation.