December 2020

VDC in 2020

2020 was an exciting and challenging year for the VDC (Virtual Design and Construction) team at MSD, Inc. Schedules became complicated as one of our main coordinating jobs shut down and others saw delays and scheduling changes. On top of that, due to the pandemic, we moved our team from the office to a virtual

VDC in 2020 Read More »

88th Med

MSD Inc. entered into an agreement with Perini Management Services for the HVAC and Plumbing work on a renovation project at the WPAFB Hospital, Building 88, which had a total contracted value of over $6 million dollars. The HVAC work that MSD completed includes the following: • Demo and Reinstall (1) Indoor Air Handling unit

88th Med Read More »

Fabrication Shop

MSD manufacturing and fabrication shop offers a wide variety of services from manufacturing ready to assemble sheet metal duct work to complete mechanical skid packages.   Quality is our top priority at MSD.  With superior continuous training we are positioned to provide a top-quality product in a timely manner.  At MSD our Fabrication/Manufacturing department is

Fabrication Shop Read More »

WPAFB Sensors Lab

Wright-Patt Air Force Base sought contractors to renovate and add onto the Sensors Lab. The HVAC portion of the project was over $13 million.

  • MSD served as the Design Assist Contractor in conjunction with Heapy Engineering for this project. In collaborating with General Contractor, Butt Construction, MSD provided Design Assist solutions for the following:
    • A large, anechoic chamber
    • An outdoor range
    • Multiple, Class-100 clean rooms
    • A three-story office building addition with DCID 6-9 requirements on many of the rooms

WPAFB Chilled Water System

The chilled water system at a high-security building on the Air Force Base was undersized and unable to keep up with demand. The facility could not operate without chilled water due to the amount of information servers in the building, and the general nature of the building itself. The entire upgrade project would need to be completed with minimal shut down time at the building. HVAC portion of this project was over $3 million.

  • MSD worked in collaboration with Diaz Construction to complete the system upgrades on time and on budget with minimal shutdowns or disruption to the facility operations.

LJB, Inc.

LJB, Inc. was renovating their Miamisburg, OH office and wanted to incorporate energy-saving upgrades.

  • MSD provided Design Build services in tandem with Greensleeves Energy Solutions, a specialist in geothermal systems.
  • MSD and Greensleeves installed a new geothermal HVAC system with open and closed loops. In addition, MSD design and installed the plumbing portion of the renovation.