MSD, Inc is thankful for…..

We asked out team members to let us know what they were most thankful for this holiday season. Read some responses below!

I am thankful for my son and husband, they are my reason to get up daily and keep going. – Tori Sherrock

Thankful for Family, and the opportunity to work with so many amazing people, committed to exceeding our client’s expectations,  and impacting our communities in a positive manner! -Nick Davis

I am thankful for my family, my friends, and my incredible fiance. 2021 has given me so many things to be thankful for. – Carlee Kremer

Thankful for physical, emotional, and spiritual health. – Dennis Garber

I am thankful for my wife, family, and great friends, I’m thankful to live in a free country with so many opportunities that allows me to have so much in my life. – Mike Workman

I am so thankful for my sons, also known as great dannios, my beautiful girlfriend, the Christmas tree being up, and spending time with friends and family while navigating this wild thing called life! – Brian Bafford

I’m grateful to have a wonderful family, friends, co-workers, and clients. – Joe Thacker

I believe I am most thankful for my family, health and working with everyone at MSD, Inc. – Randy Rose

WPAFB Sensors Lab

Wright-Patt Air Force Base sought contractors to renovate and add onto the Sensors Lab. The HVAC portion of the project was over $13 million.

  • MSD served as the Design Assist Contractor in conjunction with Heapy Engineering for this project. In collaborating with General Contractor, Butt Construction, MSD provided Design Assist solutions for the following:
    • A large, anechoic chamber
    • An outdoor range
    • Multiple, Class-100 clean rooms
    • A three-story office building addition with DCID 6-9 requirements on many of the rooms

WPAFB Chilled Water System

The chilled water system at a high-security building on the Air Force Base was undersized and unable to keep up with demand. The facility could not operate without chilled water due to the amount of information servers in the building, and the general nature of the building itself. The entire upgrade project would need to be completed with minimal shut down time at the building. HVAC portion of this project was over $3 million.

  • MSD worked in collaboration with Diaz Construction to complete the system upgrades on time and on budget with minimal shutdowns or disruption to the facility operations.

LJB, Inc.

LJB, Inc. was renovating their Miamisburg, OH office and wanted to incorporate energy-saving upgrades.

  • MSD provided Design Build services in tandem with Greensleeves Energy Solutions, a specialist in geothermal systems.
  • MSD and Greensleeves installed a new geothermal HVAC system with open and closed loops. In addition, MSD design and installed the plumbing portion of the renovation.

Exciting Career Opportunities Await! Be Part of Our Growing Team!