Carlee Kremer

Maintenance Programs

During these unique economic periods, there is sometimes a trend to pull back on maintenance programs in an effort to reduce expenses. This, quite often, has the opposite effect. Postponing, deferring, or eliminating a comprehensive maintenance program may lead to elevated future costs related to major repairs and equipment failures down the road. There are […]

Maintenance Programs Read More »

School Bus Safety

School Bus Safety As schools resume, all be it on a limited basis, I think it is important that we review the laws and safe practices of driving around school busses. Even if there will be fewer busses this season than in previous ones, their cargo is no less precious. Knowing that children, especially young

School Bus Safety Read More »

Give to Grow

MSD prides itself on giving back to the local communities, through time, hands‐on labor, and financial resources. We support, participate in and sponsor a variety of initiatives, charities, and programs that we believe will improve the quality of life in our community and build stronger neighborhoods and a stronger future for those in our area.

Give to Grow Read More »

Think Positive

I had a mentor in my life that always reminded me, “Your attitude determines your altitude”. I don’t know anyone that has the greatest attitude or is always positive 24 hours a day 7 days a week, but what if we made a conscious effort to begin to look for the true value in the

Think Positive Read More »

The Conner Group

MSD Inc. entered into agreement with Messer Construction Company to provide Domestic Plumbing and Gas Piping work for The Connor Group Corporate Headquarters. The project is located in Dayton, Ohio. The building contains a total of 39,825 square feet of office space. The contracted value of this project was $466,000. MSD was responsible for the

The Conner Group Read More »

WPAFB Sensors Lab

Wright-Patt Air Force Base sought contractors to renovate and add onto the Sensors Lab. The HVAC portion of the project was over $13 million.

  • MSD served as the Design Assist Contractor in conjunction with Heapy Engineering for this project. In collaborating with General Contractor, Butt Construction, MSD provided Design Assist solutions for the following:
    • A large, anechoic chamber
    • An outdoor range
    • Multiple, Class-100 clean rooms
    • A three-story office building addition with DCID 6-9 requirements on many of the rooms

WPAFB Chilled Water System

The chilled water system at a high-security building on the Air Force Base was undersized and unable to keep up with demand. The facility could not operate without chilled water due to the amount of information servers in the building, and the general nature of the building itself. The entire upgrade project would need to be completed with minimal shut down time at the building. HVAC portion of this project was over $3 million.

  • MSD worked in collaboration with Diaz Construction to complete the system upgrades on time and on budget with minimal shutdowns or disruption to the facility operations.

LJB, Inc.

LJB, Inc. was renovating their Miamisburg, OH office and wanted to incorporate energy-saving upgrades.

  • MSD provided Design Build services in tandem with Greensleeves Energy Solutions, a specialist in geothermal systems.
  • MSD and Greensleeves installed a new geothermal HVAC system with open and closed loops. In addition, MSD design and installed the plumbing portion of the renovation.