blog

Dayton Foodbank

TEAM MSD is proud to partner with Danis, LLK Greenhouse Solutions and Chapel Electric on the Dayton Foodbank Greenhouse Improvement Project. It is our honor to work with these amazing organizations in supporting the ongoing fight against hunger in our community! #DaytonFoodbank, #Teamwork   https://www.linkedin.com/posts/thefoodbankinc_something-big-is-in-the-works-our-garden-activity-6785291244412248065-OoWa

Dayton Foodbank Read More »

Ventilation in Buildings

CDC recommends a layered strategy to reduce exposures to SARS-CoV-2, the virus that causes COVID-19. This includes using multiple mitigation strategies with several layers of safeguards to reduce the spread of disease and lower the risk of exposure. While it may not be necessary to apply every consideration to be protective, implementing multiple mitigation strategies

Ventilation in Buildings Read More »

Meet Lisa Lute

I am a Contract Administrator here at MSD. My role is creating billings for Construction, Controls, Special Projects, and Electrical. I process contracts, work with our insurance agent to provide insurance for customers and general contractors. I also communicate with general contractors on billing and construction required paperwork as well as vendor waivers required on

Meet Lisa Lute Read More »

WPAFB Sensors Lab

Wright-Patt Air Force Base sought contractors to renovate and add onto the Sensors Lab. The HVAC portion of the project was over $13 million.

  • MSD served as the Design Assist Contractor in conjunction with Heapy Engineering for this project. In collaborating with General Contractor, Butt Construction, MSD provided Design Assist solutions for the following:
    • A large, anechoic chamber
    • An outdoor range
    • Multiple, Class-100 clean rooms
    • A three-story office building addition with DCID 6-9 requirements on many of the rooms

WPAFB Chilled Water System

The chilled water system at a high-security building on the Air Force Base was undersized and unable to keep up with demand. The facility could not operate without chilled water due to the amount of information servers in the building, and the general nature of the building itself. The entire upgrade project would need to be completed with minimal shut down time at the building. HVAC portion of this project was over $3 million.

  • MSD worked in collaboration with Diaz Construction to complete the system upgrades on time and on budget with minimal shutdowns or disruption to the facility operations.

LJB, Inc.

LJB, Inc. was renovating their Miamisburg, OH office and wanted to incorporate energy-saving upgrades.

  • MSD provided Design Build services in tandem with Greensleeves Energy Solutions, a specialist in geothermal systems.
  • MSD and Greensleeves installed a new geothermal HVAC system with open and closed loops. In addition, MSD design and installed the plumbing portion of the renovation.

Exciting Career Opportunities Await! Be Part of Our Growing Team!