blog

The Conner Group

MSD Inc. entered into agreement with Messer Construction Company to provide Domestic Plumbing and Gas Piping work for The Connor Group Corporate Headquarters. The project is located in Dayton, Ohio. The building contains a total of 39,825 square feet of office space. The contracted value of this project was $466,000. MSD was responsible for the […]

The Conner Group Read More »

Meijer Distribution Center

[vc_row type=”in_container” full_screen_row_position=”middle” scene_position=”center” text_color=”dark” text_align=”left” overlay_strength=”0.3″ shape_divider_position=”bottom”][vc_column column_padding=”no-extra-padding” column_padding_position=”all” background_color_opacity=”1″ background_hover_color_opacity=”1″ column_shadow=”none” column_border_radius=”none” width=”2/3″ tablet_text_alignment=”default” phone_text_alignment=”default” column_border_width=”none” column_border_style=”solid”][vc_column_text]This project was unique because the facility could not completely shut down operations while the existing units were removed, and the new units were set in their place. Because of this, it was determined that the units

Meijer Distribution Center Read More »

It’s Great In Dayton

Hello! Welcome back to MSD’s Blog Page. We are working hard to provide you with lots of new articles and information. Recently Logos at Work sent us a link to purchase shirts to help support local restaurants. We want to help them out by sharing their email & the link to their store. “Support your

It’s Great In Dayton Read More »

Meet Conner

What’s your name? Conner Trace Are you married? If so, how long, do you have kids? Neither What city/town do you live in? Fairborn How long have you worked at MSD? Six Months What is your current position here? Fab shop laborer What do you like most about your career? Being able to learn everyday

Meet Conner Read More »

Hot Water Systems

At MSD, Inc. we believe our responsibility is protecting the Public Health. As part of that responsibility we wanted to share the following article posted by PHCC discussing the importance of maintaining the ongoing balancing act between Legionella Prevention and Scald Prevention in your Facilities Hot Water Systems. If you have any concerns, Team MSD

Hot Water Systems Read More »

Keep Corona Away – Wash Wash Wash!

The Importance of Hand Washing: Source: https://www.cdc.gov/handwashing/why-handwashing.html   According to https://www.cdc.gov/handwashing/why-handwashing.html washing hands prevents illnesses and the spread of infections to others. Handwashing with soap and water removes germs from your hands. This helps prevent infections because: People frequently touch their eyes, nose, and mouth without even realizing it. Germs can get into the body

Keep Corona Away – Wash Wash Wash! Read More »

Covid – 19

  As we all work through the new changes in how we do our daily work, our business and facilities continue in operation to meet the needs of so many. MSD is considered an essential provider and is still providing 100% of the services to help keep your systems in operation and healthy. Our commitment

Covid – 19 Read More »

Victory Project

[vc_row type=”in_container” full_screen_row_position=”middle” scene_position=”center” text_color=”dark” text_align=”left” overlay_strength=”0.3″ shape_divider_position=”bottom”][vc_column column_padding=”no-extra-padding” column_padding_position=”all” background_color_opacity=”1″ background_hover_color_opacity=”1″ column_shadow=”none” column_border_radius=”none” width=”1/1″ tablet_text_alignment=”default” phone_text_alignment=”default” column_border_width=”none” column_border_style=”solid”][vc_row_inner column_margin=”default” text_align=”left”][vc_column_inner column_padding=”no-extra-padding” column_padding_position=”all” background_color_opacity=”1″ background_hover_color_opacity=”1″ column_shadow=”none” column_border_radius=”none” width=”1/1″ column_border_width=”none” column_border_style=”solid”][vc_column_text]The Victory Project specializes in mentoring court-involved, disadvantaged young men in Montgomery Country. Their mission is to empower young men to discover the life God intended

Victory Project Read More »

MSD FABRICATION A DIFFERENCE MAKER

[vc_row type=”in_container” full_screen_row_position=”middle” scene_position=”center” text_color=”dark” text_align=”left” overlay_strength=”0.3″ shape_divider_position=”bottom”][vc_column column_padding=”no-extra-padding” column_padding_position=”all” background_color_opacity=”1″ background_hover_color_opacity=”1″ column_shadow=”none” column_border_radius=”none” width=”1/1″ tablet_text_alignment=”default” phone_text_alignment=”default” column_border_width=”none” column_border_style=”solid”][vc_row_inner column_margin=”default” text_align=”left”][vc_column_inner column_padding=”no-extra-padding” column_padding_position=”all” background_color_opacity=”1″ background_hover_color_opacity=”1″ column_shadow=”none” column_border_radius=”none” width=”1/1″ column_border_width=”none” column_border_style=”solid”][vc_column_text]At MSD, we create 3D models in our (VDC) Virtual Design Construction Department of our systems using real world materials & equipment from manufacturers’ own libraries.

MSD FABRICATION A DIFFERENCE MAKER Read More »

WPAFB Sensors Lab

Wright-Patt Air Force Base sought contractors to renovate and add onto the Sensors Lab. The HVAC portion of the project was over $13 million.

  • MSD served as the Design Assist Contractor in conjunction with Heapy Engineering for this project. In collaborating with General Contractor, Butt Construction, MSD provided Design Assist solutions for the following:
    • A large, anechoic chamber
    • An outdoor range
    • Multiple, Class-100 clean rooms
    • A three-story office building addition with DCID 6-9 requirements on many of the rooms

WPAFB Chilled Water System

The chilled water system at a high-security building on the Air Force Base was undersized and unable to keep up with demand. The facility could not operate without chilled water due to the amount of information servers in the building, and the general nature of the building itself. The entire upgrade project would need to be completed with minimal shut down time at the building. HVAC portion of this project was over $3 million.

  • MSD worked in collaboration with Diaz Construction to complete the system upgrades on time and on budget with minimal shutdowns or disruption to the facility operations.

LJB, Inc.

LJB, Inc. was renovating their Miamisburg, OH office and wanted to incorporate energy-saving upgrades.

  • MSD provided Design Build services in tandem with Greensleeves Energy Solutions, a specialist in geothermal systems.
  • MSD and Greensleeves installed a new geothermal HVAC system with open and closed loops. In addition, MSD design and installed the plumbing portion of the renovation.