blog

Hot Water Systems

At MSD, Inc. we believe our responsibility is protecting the Public Health. As part of that responsibility we wanted to share the following article posted by PHCC discussing the importance of maintaining the ongoing balancing act between Legionella Prevention and Scald Prevention in your Facilities Hot Water Systems. If you have any concerns, Team MSD […]

Hot Water Systems Read More »

Keep Corona Away – Wash Wash Wash!

The Importance of Hand Washing: Source: https://www.cdc.gov/handwashing/why-handwashing.html   According to https://www.cdc.gov/handwashing/why-handwashing.html washing hands prevents illnesses and the spread of infections to others. Handwashing with soap and water removes germs from your hands. This helps prevent infections because: People frequently touch their eyes, nose, and mouth without even realizing it. Germs can get into the body

Keep Corona Away – Wash Wash Wash! Read More »

Covid – 19

  As we all work through the new changes in how we do our daily work, our business and facilities continue in operation to meet the needs of so many. MSD is considered an essential provider and is still providing 100% of the services to help keep your systems in operation and healthy. Our commitment

Covid – 19 Read More »

Victory Project

[vc_row type=”in_container” full_screen_row_position=”middle” scene_position=”center” text_color=”dark” text_align=”left” overlay_strength=”0.3″ shape_divider_position=”bottom”][vc_column column_padding=”no-extra-padding” column_padding_position=”all” background_color_opacity=”1″ background_hover_color_opacity=”1″ column_shadow=”none” column_border_radius=”none” width=”1/1″ tablet_text_alignment=”default” phone_text_alignment=”default” column_border_width=”none” column_border_style=”solid”][vc_row_inner column_margin=”default” text_align=”left”][vc_column_inner column_padding=”no-extra-padding” column_padding_position=”all” background_color_opacity=”1″ background_hover_color_opacity=”1″ column_shadow=”none” column_border_radius=”none” width=”1/1″ column_border_width=”none” column_border_style=”solid”][vc_column_text]The Victory Project specializes in mentoring court-involved, disadvantaged young men in Montgomery Country. Their mission is to empower young men to discover the life God intended

Victory Project Read More »

MSD FABRICATION A DIFFERENCE MAKER

[vc_row type=”in_container” full_screen_row_position=”middle” scene_position=”center” text_color=”dark” text_align=”left” overlay_strength=”0.3″ shape_divider_position=”bottom”][vc_column column_padding=”no-extra-padding” column_padding_position=”all” background_color_opacity=”1″ background_hover_color_opacity=”1″ column_shadow=”none” column_border_radius=”none” width=”1/1″ tablet_text_alignment=”default” phone_text_alignment=”default” column_border_width=”none” column_border_style=”solid”][vc_row_inner column_margin=”default” text_align=”left”][vc_column_inner column_padding=”no-extra-padding” column_padding_position=”all” background_color_opacity=”1″ background_hover_color_opacity=”1″ column_shadow=”none” column_border_radius=”none” width=”1/1″ column_border_width=”none” column_border_style=”solid”][vc_column_text]At MSD, we create 3D models in our (VDC) Virtual Design Construction Department of our systems using real world materials & equipment from manufacturers’ own libraries.

MSD FABRICATION A DIFFERENCE MAKER Read More »

WPAFB Sensors Lab

Wright-Patt Air Force Base sought contractors to renovate and add onto the Sensors Lab. The HVAC portion of the project was over $13 million.

  • MSD served as the Design Assist Contractor in conjunction with Heapy Engineering for this project. In collaborating with General Contractor, Butt Construction, MSD provided Design Assist solutions for the following:
    • A large, anechoic chamber
    • An outdoor range
    • Multiple, Class-100 clean rooms
    • A three-story office building addition with DCID 6-9 requirements on many of the rooms

WPAFB Chilled Water System

The chilled water system at a high-security building on the Air Force Base was undersized and unable to keep up with demand. The facility could not operate without chilled water due to the amount of information servers in the building, and the general nature of the building itself. The entire upgrade project would need to be completed with minimal shut down time at the building. HVAC portion of this project was over $3 million.

  • MSD worked in collaboration with Diaz Construction to complete the system upgrades on time and on budget with minimal shutdowns or disruption to the facility operations.

LJB, Inc.

LJB, Inc. was renovating their Miamisburg, OH office and wanted to incorporate energy-saving upgrades.

  • MSD provided Design Build services in tandem with Greensleeves Energy Solutions, a specialist in geothermal systems.
  • MSD and Greensleeves installed a new geothermal HVAC system with open and closed loops. In addition, MSD design and installed the plumbing portion of the renovation.

Exciting Career Opportunities Await! Be Part of Our Growing Team!