Going Touchless – Stop the Spread

Replacing aging fixtures with newer touchless devices has always been a great way to save our resources, increase hygiene levels and reduce water costs. With the pandemic and the emphasis on reducing the spread. Touchless devices became top of mind as an added layer to help protect our workers and family from the potential spread. We have upgraded many facilities this year and as you would believe demand on manufactures has been very high. When one of our clients recently requested their facility be upgraded to touchless, lead times for quality systems were also at high levels. We are thankful to have such great relationships with our suppliers that they will do whatever is needed to help us serve our clients with the utmost speed. Because of this our team was able to obtain the equipment quicker than expected and installed it sooner than anticipated. Bryon, one of our Plumbing Service technicians worked with our supplier to make it all happen at great speed. Our team installed several hands-free lavatory faucets, bottle fillers, pressure-assisted toilets, and flush valves to help our client provide their staff with an added layer of safety they desired.

Preventing the spread to just one person makes all the efforts everyone puts in worth it. As we move into the future, these types of products need to stay top of mind. Not only do touchless materials and equipment help stop the spread of germs but it also conserves large amounts of water. Most faucets in larger facilities can save hundreds of gallons of water over the course of a couple of years. If your facility is interested in “going touchless” reach out to our team for all the help you might need.

Stay safe.

WPAFB Sensors Lab

Wright-Patt Air Force Base sought contractors to renovate and add onto the Sensors Lab. The HVAC portion of the project was over $13 million.

  • MSD served as the Design Assist Contractor in conjunction with Heapy Engineering for this project. In collaborating with General Contractor, Butt Construction, MSD provided Design Assist solutions for the following:
    • A large, anechoic chamber
    • An outdoor range
    • Multiple, Class-100 clean rooms
    • A three-story office building addition with DCID 6-9 requirements on many of the rooms

WPAFB Chilled Water System

The chilled water system at a high-security building on the Air Force Base was undersized and unable to keep up with demand. The facility could not operate without chilled water due to the amount of information servers in the building, and the general nature of the building itself. The entire upgrade project would need to be completed with minimal shut down time at the building. HVAC portion of this project was over $3 million.

  • MSD worked in collaboration with Diaz Construction to complete the system upgrades on time and on budget with minimal shutdowns or disruption to the facility operations.

LJB, Inc.

LJB, Inc. was renovating their Miamisburg, OH office and wanted to incorporate energy-saving upgrades.

  • MSD provided Design Build services in tandem with Greensleeves Energy Solutions, a specialist in geothermal systems.
  • MSD and Greensleeves installed a new geothermal HVAC system with open and closed loops. In addition, MSD design and installed the plumbing portion of the renovation.

Exciting Career Opportunities Await! Be Part of Our Growing Team!