July Employee Shout-Outs

Sara Sowers

I just wanted to shoot you an email regarding how amazing Sara has been to work with.

She is one of the busiest people in the company, yet she always finds a window and a way to help me out. She has gone with me to survey customer sites and to meetings and has been absolutely clutch in both capacities. Her responsiveness and follow-through are top-notch and her willingness to work with me and keep me in the loop on everything has been exemplary.

I just want to make sure she is getting the recognition she deserves for the job she is doing. I cannot say enough good things about her.

Submitted by: Eric Eversole

 

Scott Janowiecki

Ireceived a telephone call from a woman who had a flat tire on the ramp from Woodman to Springfield Street today and one of our guys changed her tire. After discussing with the team Scott Janowiecki helped her! Scott thank you so much for representing our team in a professional and helpful manner. The woman wanted us to pass along her gratitude.

Submitted by: Evelyn Biza

WPAFB Sensors Lab

Wright-Patt Air Force Base sought contractors to renovate and add onto the Sensors Lab. The HVAC portion of the project was over $13 million.

  • MSD served as the Design Assist Contractor in conjunction with Heapy Engineering for this project. In collaborating with General Contractor, Butt Construction, MSD provided Design Assist solutions for the following:
    • A large, anechoic chamber
    • An outdoor range
    • Multiple, Class-100 clean rooms
    • A three-story office building addition with DCID 6-9 requirements on many of the rooms

WPAFB Chilled Water System

The chilled water system at a high-security building on the Air Force Base was undersized and unable to keep up with demand. The facility could not operate without chilled water due to the amount of information servers in the building, and the general nature of the building itself. The entire upgrade project would need to be completed with minimal shut down time at the building. HVAC portion of this project was over $3 million.

  • MSD worked in collaboration with Diaz Construction to complete the system upgrades on time and on budget with minimal shutdowns or disruption to the facility operations.

LJB, Inc.

LJB, Inc. was renovating their Miamisburg, OH office and wanted to incorporate energy-saving upgrades.

  • MSD provided Design Build services in tandem with Greensleeves Energy Solutions, a specialist in geothermal systems.
  • MSD and Greensleeves installed a new geothermal HVAC system with open and closed loops. In addition, MSD design and installed the plumbing portion of the renovation.